Loading...
HomeMy WebLinkAboutHoneybee Lane asphalt workPavement Maintenance Proposal Bonneville Joint School District No. 93 Cody Jackson Project: Honeybee Lane asphalt work 10841 N 41st E Idaho Falls, Idaho 83401 Dallyn Bleazard Managing PartnerPage 1 Proposal: Honeybee Lane asphalt work Company Info Contact Person Klingler Asphalt, LLC P.O. Box 202 Moreland, Idaho 83256 P: 208-785-7494 F: 208-785-1528 http://www.klinglerasphalt.com Dallyn Bleazard Managing Partner Dallyn@klinglerasphalt.com Cell: 208-715-1882 Office 208-785-7494 About Us          We Solve Problems & Make Pavement Maintenance Simple Klingler Asphalt provides pavement design, maintenance & construction services to the residential, commercial, and industrial markets to Idaho, Northern Utah, Western Wyoming and Southern Montana.  We have modern state of the art equipment as well as an outstanding and highly trained crew to serve you. Please find the enclosed proposal and do not hesitate to call us with any questions. Your Pavement Contractor Page 2 Proposal: Honeybee Lane asphalt work New asphalt parking lot, approximately 3000 ft.² backside of bus parking building 1.1.This pricing includes 4 dump truck loads or 60 tons of three-quarter road base which is needed to raise the parking lot nearest the building up in order to get the water to flow out to the street. Total Price: $10,350.00 Remove one speed bump and add two additional speed bumps as specified in satellite view Total Price: $3,300.00 Install new asphalt for two additional parking spots nearest stop sign.Approximately 800 ft.² Total Price: $2,900.00 Install new asphalt around fire hydrant Total Price: $650.00 Line stripping at honeybee turn lanes as well as stop bar. 1.Restripe the parking lot area as per the existing layout. 2.Stripe new parking lot as per drawings. Total Price: $350.00 Remove and replace asphalt around water shut off valve in westbound lane. Approximately 10’ x 10’. Total Price: $550.00 Page 3 Proposal: Honeybee Lane asphalt work Image   Notes: Page 4 Proposal: Honeybee Lane asphalt work Please find the following breakdown of all services we have provided in this proposal. This proposal originated on June 08, 2026. Job Number: 6108 Item Description Cost 1.New asphalt parking lot, approximately 3000 ft.² backside of bus parking building $10,350.00 2.Remove one speed bump and add two additional speed bumps as specified in satellite view $3,300.00 3.Install new asphalt for two additional parking spots nearest stop sign.Approximately 800 ft.²$2,900.00 4.Install new asphalt around fire hydrant $650.00 5.Line stripping at honeybee turn lanes as well as stop bar.$350.00 6.Remove and replace asphalt around water shut off valve in westbound lane. Approximately 10’ x 10’.$550.00 Total:$18,100.00 Authorization to Proceed & Contract You are hereby authorized to proceed with the work as identified in this contract. By signing and returning this contract, you are authorized to proceed with the work as stated. We understand that if any additional work is required different than stated in the this proposal/contract it must be in a new contract or added to this contract. Please see all attachments for special conditions that may pertain to aspects of this project. Page 5 Proposal: Honeybee Lane asphalt workPrice Breakdown: Honeybee Lane asphalt work Acceptance We agree to pay the total sum or balance in full 45 days after the completion of work. I am authorized to approve and sign this project as described in this proposal as well as identified below with our payment terms and options.   Date:    Cody Jackson | Facility Manager Bonneville Joint School District No. 93 10841 N 41st E Idaho Falls, Idaho 83401 jacksonc@d93.k12.id.us C: 208-589-5544 O: 208-589-5544 Dallyn Bleazard | Managing Partner Klingler Asphalt, LLC P.O. Box 202 Moreland, Idaho 83256 E: Dallyn@klinglerasphalt.com C: 208-715-1882 P: 208-785-7494 F: 208-785-1528 http://www.klinglerasphalt.com Page 6 Proposal: Honeybee Lane asphalt work Scott G Woolstenhulme, Superintendent July 7, 2026